Why this peak needs a tighter plan

On Melbourne Cup day the Reserve Bank lifted the cash rate by 25 basis points to 4.85% [1], its highest level since November 2008 and the fifth increase this year [2]. The Board said liaison shows many firms are facing cost pressures and are raising prices or looking to, and it expects inflation to stay above 3% for the coming year [1].

Demand has not disappeared. Roy Morgan, via the Australian Retail Council, forecasts a 5.5% rise in retail sales in the six weeks before Christmas [3]. In the ABS household spending data for August 2026, released on 29 September 2026, spending on hotels, cafes and restaurants rose 0.8% in the month, seasonally adjusted, while total household spending was flat [4]. But 77% of Australians say cost-of-living pressure is changing how they shop [3].

For a QSR, that combination matters. Customers are still coming through the door, but they are more value-sensitive, so running out of a core item, a sauce, a cup size or a takeaway bag, costs more goodwill than usual. At the same time, every carton pulled forward ties up cash that now costs more to borrow. The goal is not to buy more of everything. It is to buy the right lines earlier.

Three calendars that collide this summer

Australian public holidays

In New South Wales, Christmas Day falls on Friday 25 December 2026, Boxing Day on Saturday 26 December and an additional public holiday on Monday 28 December. New Year's Day is Friday 1 January 2027 and Australia Day is Tuesday 26 January [5]. Other states and territories gazette their own dates, so check each one you trade in. In practice, suppliers, carriers and distribution centres run reduced schedules across this stretch, and the last delivery before Christmas is often earlier than store teams expect.

Lunar New Year on 6 February 2027

Lunar New Year's Day is Saturday 6 February 2027 [6]. In 2026 it fell on 17 February, so this year's runway is about 11 days shorter [7]. China's official holiday block is not yet confirmed and is usually announced in November or December [8].

Sourcing guidance for Australian importers suggests finalising samples and specifications by mid-November, confirming orders by 1 December, completing production and quality checks by 15 January, and loading goods by 22 to 25 January, with factory holidays running from about 29 January to 20 February [7]. Those dates vary by factory. Recovery is slow: factories often reopen with about 35% of their workforce and do not return to full capacity until about 6 to 20 March [8]. A shipment that normally takes six weeks door to door can stretch to twelve if it misses the window [7].

If packaging, disposables or dry goods are made in China, the January and February restock is exposed, and that restock lands straight after Christmas trading, when stock on hand is at its lowest. Vietnam's Tet falls on the same date, so ask any supplier there for its own shutdown dates rather than assuming the China calendar [7].

Freight and biosecurity

KLN Oceania reported on 21 October 2026 that carriers including ANL, Maersk, OOCL, COSCO and MSC had issued November rate increase notices ahead of the pre-Christmas rush. China terminal congestion had eased from about six days to about three, but carriers were still omitting ports on individual voyages, including Shanghai, Sydney and Melbourne, and Melbourne saw extended truck turnaround times at DP World's West Swanson Terminal in early October [9]. Its advice is to treat the vessel ETA as a guide, not the warehouse date, and to use airfreight only for critical lines [9].

The 2026-27 brown marmorated stink bug measures apply to targeted goods shipped from 1 September to 30 April inclusive. The date used is the shipped on board date on the ocean bill of lading [10]. Wood articles, articles of iron or steel, base metal cutlery and machinery from target risk countries, including the United States and many European countries, need mandatory treatment. Plastics and paper shipped from those countries are target risk goods and can be selected for random inspection. Mandatory treatment is not required for those target risk goods. The United Kingdom, China, Japan and the Republic of Korea are emerging risk countries, and goods shipped from them in the same window can also be selected for random inspection [10]. For a QSR, that can cover wooden cutlery and stirrers, metal items, kitchen equipment and some packaging, so allow inspection time on those orders. The Department of Agriculture, Fisheries and Forestry reviews the measures through the season [10].

Where to hold extra cover, and where not to

  • Ambient packaging and disposables. Cups, lids, clamshells, bags, napkins and gloves are the usual pinch points, because they are bulky, often imported and cannot be substituted easily when a store runs out. These are the lines to hold for cover through to March. See our food packaging and napkins range and our disposable gloves guide.
  • Sauces and portion control packs. Long shelf life makes them suitable for forward buying, provided you rotate stock by date mark. See sauces and condiments.
  • Frozen lines. The constraint is usually freezer space, not supply. Check capacity before you pull stock forward, and keep frozen goods frozen hard from truck to freezer. Our frozen chips page covers specification.
  • Chilled lines. Do not overstock short-life product. Tighten delivery schedules and receiving checks instead, as set out in our summer cold chain guide.

If a supplier offers a substitute item because the usual one is late, check it against state packaging bans before it reaches stores. Our single-use plastic bans guide has the state by state detail.

A peak season checklist for QSR buyers

  1. Map every holiday date. List public holidays for each state you trade in, plus each supplier's, carrier's and distribution centre's closure dates [5].
  2. Get cut-off dates in writing. Confirm the last order and last delivery date before Christmas, and the first delivery date in January, for every supplier.
  3. Rank SKUs by stockout impact. Identify the lines that would stop service or force a menu change, and focus extra cover there.
  4. Lock specifications by mid-November. Any new or changed packaging or private label artwork needs sign-off now to make pre-Lunar New Year production [7].
  5. Ask Asian suppliers for their calendars. Request the last production day, the reopening date and the expected capacity after the break [8].
  6. Plan cover through to mid-March for imported lines, based on recovery guidance rather than the official reopening date [7][8].
  7. Check storage before buying. Confirm dry store, freezer and offsite capacity, and stack safely.
  8. Allow for biosecurity time. Ask your forwarder about BMSB status for wood, metal and equipment shipments [10].
  9. Balance cash and cover. With a 4.85% cash rate [1], review payment terms and avoid tying cash up in slow-moving lines.

Our take

If a supplier has gone quiet on January dates, cannot confirm stock through Lunar New Year, or is pushing a price rise you did not plan for, talk to us before the cut-off. QSR Supplier helps Australian and New Zealand QSR and foodservice buyers source packaging, sauces and food lines to a written specification, and can help map cut-off dates and cover for the lines that would stop service.

QSR Supplier does not sell freight, customs clearance or biosecurity treatment. Shiiv Imports holds ISO 9001. Documents for a product belong to the factory that makes it. See what we source. To review a specification or a January delivery plan, send a chain brief or contact the team.

Frequently asked questions

When is Lunar New Year 2027?

Saturday 6 February 2027. That is about 11 days earlier than in 2026, when it fell on 17 February. China's official holiday block is not yet confirmed.

When should QSR buyers place orders for goods made in China before Lunar New Year?

Guidance for Australian importers suggests confirming orders by 1 December 2026, completing production by 15 January and loading goods by about 22 to 25 January 2027. Confirm the dates with each supplier, because factory calendars differ.

How long do factories take to recover after Lunar New Year?

Sourcing guidance says factories often reopen with about 35% of their workforce and typically return to full capacity around 6 to 20 March 2027. Treat that as a planning range and confirm it with the supplier.

Which public holidays affect QSR deliveries this Christmas?

In New South Wales: Friday 25 December, Saturday 26 December and Monday 28 December 2026, Friday 1 January 2027, then Australia Day on Tuesday 26 January 2027. Other states and territories set their own dates.

Are freight rates rising before Christmas?

KLN Oceania reported November rate increase notices across several major carriers, along with port omissions on individual voyages. Confirm the rate and the sailing when you book.

Do BMSB measures affect QSR packaging and equipment?

They can. For ocean shipments from 1 September to 30 April, wood articles, base metal cutlery and machinery from target risk countries need mandatory treatment. Plastics and paper from those countries can be selected for random inspection. Shipments from China, the United Kingdom, Japan and the Republic of Korea can also be selected for random inspection.

Sources

  1. 1. Reserve Bank of Australia, Monetary Policy Decision, 3 November 2026
  2. 2. Australian Retail Council, Melbourne Cup rate rise deals fresh blow to retailers ahead of Christmas, 3 November 2026
  3. 3. Australian Retail Council, Peak Season Hub 2026 insights (Roy Morgan forecasts)
  4. 4. Australian Bureau of Statistics, Monthly Household Spending Indicator, August 2026
  5. 5. NSW Government, NSW public holidays
  6. 6. GovHK, General holidays for 2027
  7. 7. Epic Sourcing, Chinese New Year 2027: The Australian Importer's Guide to Planning Around the Factory Shutdown
  8. 8. SEKO Logistics, Lunar New Year 2027: Complete Supply Chain Planning Guide for Asia Sourcing
  9. 9. KLN Oceania, FCL Shipping Rates from China to Australia: November 2026 Outlook
  10. 10. Department of Agriculture, Fisheries and Forestry, Seasonal measures for brown marmorated stink bug (BMSB)

This guide is general information, not legal, financial or biosecurity advice. Holiday dates, freight conditions and import requirements change. Check current government sources and confirm dates with your suppliers and freight forwarder. Figures were checked on 4 November 2026.